The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.
متعلقہ مضامین
-
Muzaffargarh Thermal Power Station:
-
Govt to ensure writ of state at all costs
-
Pakistan attends online training on medications
-
Balochistan governor convokes provincial assembly session to elect new speaker
-
PM Khan directs to cut prices of essential items
-
SC directs NHA to submit report on highways
-
Pakistan, Uzbekistan sign protocol on establishment of JSC
-
COVID-19 claims 11 more lives
-
SHC approves protective bail of Aijaz Jakhrani
-
PM for urgent steps to guard youth against onslaught of immoral alien culture through social media
-
Ruthless accountability in AJK to start soon: Niazi
-
Let’s fight breast cancer thru awareness: Samina Alvi