Electricity supply to the Karachi Water Board Corporation (KWSC) has been restored after resolving the temporary disruption at the Dhabeji Pumping Station on Saturday. The power utility staff is in constant coordination with the administrative department of the Water Corporation.
All the major pumping stations of the Water Board, including the Dhabiji Pumping Station, are exempted from load shedding; in case of technical fault, the Dhabiji Pumping Station is backed up with alternative power sources.
مضمون کا ماخذ : ٹمپل ٹمبل